Details: earth work excavation in slushy soil in water up to 0.60 m requiring the aid and pans and vessels with 50 mtr initial lead and 1.5 mtr initial lift and transportation by mechanical means loading in to truck and unloading the debries at prefered area away from the site within 5 km place etc complete with all labour charges and cess etc. complete and as per the direction of the engineer-in-charge. collecting conveyance and spreading of moorum from initial lead and 1.5 mtr lift etc. complete including all cost, conveyance, royalty of all materials with all labour charges and cess etc. complete and as per the direction of the engineer-in-charge.
Sector: Irrigation