Details: clearing grass and removal of up to a distance of 50 meters outside the periphery of the area with all leads, lifts, sundries, t&p required for the work etc. complete as per the direction of engineer-in-charge. cleaning the existing granular base surface including removal of binding materials and other foreign materials within wire brushes and small picas, sweeping within brooms or soft brushes and finally destiny within old gunny bags and or compressed air to receive bitumen etc. all labour charges, t&p, b &o.c. workers welfare cess etc. complete as directed by the engineer-in-charge. cement concrete (1:2:4) with 12mm hard granite crusher broken chips for c.c. work free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, etc. required for the work with proper c
Sector: Irrigation