Details: clearing grass and removal of upto a distance of 50metres outside the periphery of the area including cost of all labour t&p required for the work etc. complete in all respect and as per direction of the engineer-in-charge. providing and applying tack coat by mechanical means with bitumen emulsion using emulsion pressure distributor @ 0.2kg. per sqm.on prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of mort&h specification for road & bridge works (5th revision.) etc complete as directed by the engineer in charge providing & laying 50 mm thick av. compacted bituminous macadam (grading-ii) using vg-30 bitumen with hot mix plant using crusher broken hard granite aggregates of specified grading premixed with bituminous binder and filler, transporting the hot mix to works site, lying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the
Sector: PWD