Details: earth work in excavation of foundation trenches in hard soil within 50 meter initial leadand 1.5mt. intial lift including rough dressing and levelling the bed and depositing the soil away from work site including cost of all labour, t&p etc. complete as directed by the engineer in charge. supplying and filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, t&p required for the work etc. complete as directed by the engineer-in charge. cement concrete (1:3:6) in foundation and plinth having a specified characteristics compressive strength / target mean strength in works test and 28 days curing after mixing using 40 mm size clean hard granite crusher metal of approved quality from approved quarry including hoisting, lowering, laying concrete in layer not exceeding 15 cm thick and compacting to the required thickness and curing etc. complete with all leads & lifts including dewatering and s
Sector: PWD