Details: dismantling and removing g.c.i or a.c. sheet from sheet roofing after carefully removing the nuts and bolts including stacking of the materials for reuse and removing the debris away from works site with all leads and lifts as per direction of engineer-in-charge. labour for fixing colour sheet in roof and walling including cost of nuts and bolts etc., but excluding cost of g.c.i/tata bluescope sheet as per direction of engineer-in-charge. earth work excavation for plinth & foundation in hard soil within 50 mtrs. initial lead and 1.5 mtrs. initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtrs in depth & as per direction of engineer-in-charge. supply & filling in foundation and plinth with sand watered and rammed including the cost, conveyance, royalty, all other taxes and labour charges etc. complete. & as per direction of engineer-in-charge. cement concrete (1:3:6) with 4cm size hard granite metal including the cost, co
Sector: Generation