Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. dismantling old plaster or skirting raking out joints and cleaning thesurface for plaster including disposal of to the dumping groundwithin 50 metres lead dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. centering and shuttering including strutting, propping etc. and removal of form for:shelves (cast in situ) reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) : 3 graded stone aggregate 20 mm nominal size). steel rein
Sector: General Admin