Details: survey, planning and preparation of boq including gps embedded video etc. quantity as actual after survey. unit rate to be quoted/m basis. excavation of trench for plb pipe laying, backfilling and compaction after laying of plb pipe, blowing of optical fibre cable inside laid plb pipe, splicing and jointing of optical fibre cable including supply of video as built diagram (vabd) of constructed ofc route and acceptance testing, commissioning and makeover of the routes. the work also includes road / bridge crossing, laying of plb inside dwc pipe, wherever required. commissioning of optical fibre connectivity. the cost shall include supply, transportation and fixing of joint chamber, manhole, splice closure, fixing, painting and sign writing of route /joint indicators, termination at ftb and all the relevant accessories etc. and end to end testing of dark fibre(only the fiber will be provided by aedcl) . including comprehensive operation and maintenance cost for 5 yrs 24 core ofc 48 core
Sector: Information Technology