Details: earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.2.8.1 all kinds of soil. dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : 16.12.1 with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 sqm providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 4.2.8a 1:5:10 (1 cement : 5 manufactur
Sector: Fire And Emergency