Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. construction of granular sub-base by providing close graded material conforming to specifications, mixing in a mechanical mix plant at omc, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of engineer-in-charge. with material conforming to grade-i (size range 75 mm to 0.075 mm) having cbr value-30 providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteri
Sector: Buildings