Description: Installation of a Deep Tube well at ASEB Colony Kahilipara Ghy 19 Name of Work Installation of a Deep tube Well at ASEB Colony Kahilipara Ghy 19
Details: Civil Works Mobilisation of Drilling Rig including carrying of all materials, preparation of access to the site etc. complete and as directed by the Department. Drilling tube well by D.T.H 300 dia including exploring of aquifer by using vertical echo system including cost of fuel and carriage of compressor etc complete. Development of tube well in accordance with IS : 2800 (part I) and IS:11189, to establish maximum rate of usable water yield without sandcontent (beyond permissible limit), with required capacity aircompressor, running the compressor for required time till well is fullydeveloped, measuring yield of well by "V" notch method or any otherapproved method, measuring static level & draw down etc. by stepdraw down method, collecting water samples & getting tested inapproved laboratory, i/c disinfection of tubewell, all complete, includinghire & labour charges of air compressor, tools & accessories etc.,all as per requirement and direction of Engineer-in-charge Supplying, assem
Sector: Distribution