Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - chargenominal concrete 1:3:6 or richer mix (i/c equivalent design mix) dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: g.s. shee dismantling aluminium/ gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by engineer-in-charge. repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of to the dumping ground, all complete as per direction of engineer-in-chargewith cement mortar 1:4 (1 cement : 4 fine sand) providing corrugated g.s. sheet roofing including vertic
Sector: Buildings