Details: 15.2 demolishing cement concrete manually/ by mechanical meansincluding disposal of material within 50 metres lead as per directionof engineer - in - charge.15.2.1 nominal concrete 1:3:6 or richer mix (i/c equivalentdesign mix) 15.7.4 demolishing brick work manually/ by mechanical means includingstacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of engineer-in-charge.15.7.4 in cement mortar 15.28 dismantling roofing including ridges, hips, valleys and gutters etc.,and stacking the material within 50 metres lead of: 15.41 dismantling cement asbestos or other hard board ceiling or partitionwalls including stacking of serviceable materials and disposal ofunserviceable materials within 50 metres lead. dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : 9.3 providing wood work in frames of false ceiling, partitions e
Sector: Medical and Health