Details: part a:- general maintenance attending complaints as and whenrequired relate to the lpg pipeline.(a) repairing, replacement of all fittingsetc (material required will be supplied bythe department).(b) cleaning of all pipelines at least twicein a month of all hostel kitchen.(c) sealing of any leakage in pipeline.(d) maintaing the safety of gas bank(cylinder storage area) part b:- supply and installation of items providing, refitting & refixing of 1/2" lpg pipeline including gas manifold of gas bank as per specification including all material and overhauling (seamless pipe 1/2", adopter, non return valve, dygrolic punch, pressure meter, socket, clamp, quick safety valve (qsv), bull nose set, bend, elbow, needle control valve (ncv), hydrolic punch 5', pressure control regulator, angle, patti, blade colur, thinner brush, welding machine, transportation and fooding, labour expenses, etc) as per direction of engineer in charge to his satisfaction. isi or better supply and installation of l
Sector: Science University