Details: providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technical specificationbr.2/2 on nischintapur to belala (span 4 x 25) pile load test on single vertical pile in accordance withis:2911(part-iv).a). initial and routine load test br.2/2 on nischintapur to belala (span 4 x 25) pile load test on single vertical pile in accordance withis:2911(part-iv).b. (lateral load test) br.2/2 on nischintapur to belala (span 4 x 25)) pile integrity test. integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. test to be carried out by an approved reputed agency. item to include all incidental work to execute the jobbr.2/2 on nischintapur to belala (span 4 x 25)) bored cast-in-situ m35 grade r.c.c. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m.
Sector: Road development