Details: earth work in excavation of drainage channel by mechanical means to the proper grade and slopes as required including disposing the excavated debris/soil to a safe distance of minimum 50 m distance, etc. complete as directed.for lead up to 50 m and all lifts carriage of excavated muddy/slushy soil/garbage by truck of 10 mt capacity and depositing the same in suitable dumping ground within an average lead of 5.00 km including cost of p.o.l. and loading/unloading charges etc. complete as directed. clearing of deposited compact water hyacinth root and other aquatic plants from the bed of drains/channels including cutting, removing and stacking at places away from the bank etc. complete with all lead and lift etc. complete as directed. clearing of garbage, derbies and waste materials from the drainage channel up to a depth of 0.60 m along bed and bank slopes of the channel including carriage of the spoils to a safe distance up to 100 m and stacking in measurable stacks etc. complete as dir
Sector: Water Resource Department