Details: 9.1.1 (aphe)-earth work in excavation for foundation trenches including refilling the quantity as necessary after completion of work of pipe line dressing, ramming, watering etc. and removal of surplus earth with 50m lead and lift up to 1.50m all complete as directed including bailing out water where necessary.(b) blastic land, tillah soil, hard soil, soil mixed with moram gravel and boulders upto one man size 9.12.1 (aphe)labour charge for carrying and laying in position d.i. pipes & specials (class k-7) in line level complete as directed.(d) 150 mm dia 9.12.1 (aphe)labour charge for carrying and laying in position d.i. pipes & specials (class k-7) in line level complete as directed.(c) 125 mm dia 9.12.1 (aphe) labour charge for carrying and laying in position d.i. pipes & specials (class k-7) in line level complete as directed.(b) 100 mm dia 9.12.6 (aphe) providing joints to di s&s pipes including cutting the pipes where necessary & supplying all jointing materials where necessary w
Sector: Water supply and Sewerage