Details: river training project clearing & grubbing drain including rank vegetation, grass, bushes, shurb sapling etc. and dispose of unserviceable materials out site the periphery of the area. excavation for structures: e/w in excavation of foundation of structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavation earth to the extend required and utilising the remaining earth locally for road work) providing & laying of boulder apron laid in wire crates made with 4mm dia gi wire conforming to is:280 and is:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and jionts laid with stone boulders weighing not less than 40 kg each. cost.of haulage and loading and unloading of man size boulder in project site. providing & laying rcc signboard including writing in engrave lettering
Sector: Horticulture