Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201.(i) by manual means- removing all types of hume pipes and stackingwithin a lead of 1000 m including earthwork and dismantling of masonry works as per technical specification clause 202. a) upto 600 mm dia hume pipe dismantling of existing structures like culverts bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable mat
Sector: Road development