Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201.i) by manual meansa) in area of non-thorny jungle removing all types of hume pipes and stacking within a lead of 1000 m including earthwork and dismantling of masonry works as per technical specification clause 202.rate as per sor - 2020-21qty. as per road inventory(c) above 900 mm dia hume pipe iii)excavation in soil using hydraulic excavator and tippers with disposal upto1000 m excavation for roadwork in soil with hydraulic excavator of 0.9 bucketcapacity including cutting and loading in tip
Sector: Road development