Details: earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design building specification and direction of e/i. extra for earth work hard soil (vide classification of soil item-b) as per approved design building specification and direction of e/i earth filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered rammed, fully compacted & fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 m & lift of 1.5 m all complete as per building specification and direction of e/i.( mode of measurement compacted volume) providing designation 75b one brick flat soling joint filled with local sand including cost of watering taxes royalty all complete as per building specification and direction
Sector: Industry Development