Details: providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia m.s. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with m.s. tubes, m.s. tube challis, m.s. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. the scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of engineer-in-charge. pvc screen & tin sheet protectionto avoid any dismental parts for outside roads and
Sector: Industry Development