Details: civil work dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. dismantling of flushing cistern of all types (c.i./pvc/vitrious china) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. dismantling g.i. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means ncluding stacking of pipes within 50 metres lead as per direction of engineer-in-charge :15 mm to 40 mm nominal bore above 40 mm nominal bore dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of engineer-in-charge dismantling pucca brick or lime work in
Sector: Zilla Parishad