Details: civil work earth work in soil by manual means of excavation in foun dation as per is specification with pcc pedestal all complete. providing gsb in close graded material , mixing in a mechanical mix plant at omc , carriage of mixed material to work site spreading in uniform layers with motor grader on prepared surafce and compacting with vibratory roller to achieve desired density complete as per e/i. providing r.c.c m-20 with normal mix of (1:1.5:3) in foun dation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of f.m. 2.5 to 3 including shuting mixing cement concrete in mixer and placing in position vibrating striking curing (but excluding the cost of reniforcement, taxes and royalty all complete, as per building specification and direction and direction of e/l. centring & shuttering in open foundation as per is specification with pcc pedestal all complete. eart filling in foundation trenches as per is specification with pcc pedestal all complete.
Sector: Zilla Parishad