Description: Construction of Temporary Bathroom during Lok Sabha Election 2024 in different location for CAPF and SAP under D W and S Div Pakur GROUP NO BR 05 Name of work Construction of Temporary Bathroom during Lok Sabha Election 2024 in different location for CAPF SAP under D W S Div Pakur
Details: BATHROOM Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/l. Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement compacted volume) Providing designation 75B one brick flat soling -do- --do-- 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) Providing 12mm cement plaster (1:3) with clean coarse sand of F.M 1.5 with floating coat of neat cement in skirting including rounding of junctions with floor, cu
Sector: Water supply and Sewerage