Details: earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item - a) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design building specification and direction of e/i. earth filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered rammed, fully compacted & fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 m & lift of 1.5 m all complete as per building specification and direction of e/i.( mode of measurement compacted volume) earth filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered rammed, fully compacted & fine dressed with earth obtainedafter cutting within a lead of 50 m & lift of 1.5 m all complete as per building specification and direction of e/i.( mode of measurement compacted vo
Sector: Industry Development