Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. (by mechanical means using dozer in area of light jungle) rcdsor 2.03 (ii) a dismantling of flexible pavements and disposal of dismanted materials up to a lead of 1000 metres, stacking servieable and unservieable materials separately. rcdsor 2.05 removal of telephone/electric poles including excavation and dismantling of foundation concrete and lines under the superviion of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the servieable and unservieable material separately. rcdsor 2.14 excavation for road work in soil with hydraulic excavator including cutting and loadin
Sector: Road development