Details: earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item a) and disposal of excavated earth as obtained to a distance upto 50m including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of e/i. earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 m and lift of 1.5 m all complete as per building specification and direction of e/i. (mode of measurement compacted volume) filling in foundation trenches and plinth in layers. not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 m and lift of 1.5 m all complete as per building specification and direction of e/i (mode of measurement compacted
Sector: Zilla Parishad