Details: (i) vill. bakoria, n.h.-75 (hurhuri more) to primary school, charwadih (l-1.200 km.)clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification clause 201 construction of subgrade and earthen shoulders (construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2) providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. prime coat over wmm/wbm (providing and applying primer coat with ss1 grade bitumen emulsion on prepared surface of granular bas
Sector: RDPR