Details: Shifting (Dismantling and Reconstruction) of High mast pole including foundation & all required electrical/ OFC connection and fittings to the location as per drawing and direction of Engineer in charge.Sahajanand chowkEach2Shifting (Dismantling and Reconstruction) of Signal light pole including foundation & all required electrical/ OFC connection and fittings to the location as per drawing and direction of Engineer in charge.EachSahajanand chowk
Sector: Infrastructure