Details: shifting of existing bus stand/shelter (dismantling and reconstruction) along with foundation and to the location as per drawing and direction of engineer in charge.(1) bus shelter near argora chowk - 8m x 3m x3.25m along with holding board (mild steel) bus shelter near argora chowk- 6m x 2.5mx3.25m along withholding board (mild steel and concrete)complete stainless steel bus shelter with foundation (12m x 3m) (ss grade 304 column, rafter, purlin, roof sheet- polycarbonate sheet, ss grade 304 frame for advertisement board, ss sheet for advertisement board, acrylic sheet for route board, ss grade 304 connectors for advertisement board) with cycle stand, kiosk & eco toilet and in rooftop solar pannels are installed as per drawing and technical specification. (with defect liability period of 12 months from date of handover)argora chowkshifting (dismantling and reconstruction) of street light pole including foundation & all required electrical/ofc connection and fittings to the location
Sector: Infrastructure