Description: Construction of Watch Tower 1 and 2 at I R B 9 Giridih in the district of Giridih Name of Work Construction of Watch Tower 1 2 at I R B 9 Giridih in the district of Giridih
Details: Section I Building Works 5.1.1Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs, all complete as per approved design, building specification and direction of E/I. 5.1.2Extra for earth work in hard soil as per specification and direction of E/I.( vide classification of soil item B) DSR 2.7.3Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 5.1.7Filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a le
Sector: Police and Internal Security