Details: bridge workearth work in excavation of foundation trenches of toe wall, spillway, head regulator, outlet, intake well etc. as per designed section kankar, pebbles and boulders upto 300mm size and disposal of the same (beyond 50m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 m as per specification and direction of e/i. earth work in excavation of foundation trenches of toe wall, spillway, head regulator, intake well and outlet etc. as per designed section in ordinary rock or soft rock (vide classification of soil item-c) with disposal of soil (beyond 50m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 m as per specification and direction of e/i. (soft rock where blasting is not required . providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- all works upto plinth level : 1:2:4 (1
Sector: Zilla Parishad