Details: p.c.c road (12 ft.) length 150 mtr. 2.3 (ii) a clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. 3.06excavation in soil using hydraulic excavator ck 90 and tippers with disposal upto 1000 metres. (excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)including royalty etc.@ rs. 27.48 per , cost of watering, rolling & compaction. 3.19 loosening, leveling and compacting original ground supporting embankment t
Sector: Police and Internal Security