Details: earth work in excavation of canals and dhars carrying minimum full supply discharge above 28 cumecs (1000 cusecs) in ordinary soil (vide classification of soil item -a) and making the banks with excavated earth in proper profile and clod breaking and laying earth in 225mm layers with an initial lead of 30 m and lift of 1.5m. all complete as per approved design. specification and direction of e/i.(7.1.6) earthwork in exacavation of foundation trenches in ordinary soil (vide classification of soil item -a)and disposal of excavated earth so obtained to a distance up to 50m and average lift of 1.5m including leveling, ramming the foundation trenches removing the roots of shrubs etc, all complete job as per specification and direction of e/i {7.1.27} providing coarse clean local sand in filling in foundation trenches including ramming, watering, royalty and all other taxes complete job as per specification and direction of e/i.(7.1.37) plain cement concrete 1:3:6 nominal mix in
Sector: Water Resource Department