Details: dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks with in 15 m lead and disposal of uncerviceable materials earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item a) and disposal of excavated earth as obtained to a distance upto 50m including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of e/i. construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front loader at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401with grading-iii material providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth
Sector: Urban Authority