Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area as per technical specifications.o.r. item no. 2.02 excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m s.o.r. item no. 3.06 construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and leads transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2s.o.r. item no. 3.18 construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(by mix
Sector: RDPR