Details: earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item -a ) and disposal of excavated earth as obtained to a distance up to 50 m. including all lift , leveling ramming the foundation trenches , removing roots of trees, shrubs all complete as per approved design, building specification and direction of e/i. (vide item no. 5.1.1) providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of e/l. (vide item no. 5.1.10) filling in foundation trenches and plinth in layers not exceeding 150mm thick well-watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50m and lift of 1.5m all complete as per specification and direction of e/l. (vide item no. 5.1.7) prov
Sector: Water Resource Department