Details: (1) pcc road fromlabour required for site clearence ,cutting levelling and dressing all comp providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering m10(1:3:6) all complete as per specification and direction of engineer-in-charge providing centering and shuttering including strutting,propping etc and removal of form for foundation all complete as per specification and direction of engineer-in-charge filling in foundation both side of road embankment . (flank filling) carraige of materialssand (lead upto 28 km) stone chips (lead upto 18 km) cement (lead upto 10 km) paver blocklabour requirec for site clearance all complete as per approved design, building specification and direction of e/i. e/w in excavation in foundation trenches in ordinary soil (vide classification of soil item – a ) and disposal of excavated earth clearance as obtined to a distebce up to 50 m including all lifts with leveling, ramming the foundation
Sector: Zilla Parishad