Details: bridge partexcavation for strucutres earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.mechanical meansdepth upto 3 m depth 3 m to 6 m excavation for strucutres earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.ordinary rock ( not requiring blasting)mechanical means filling annular space around footing in rock pcc 1:3:6 in foundationplain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. plain/reinfoced c
Sector: RDPR