Details: earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-a)and disposal of excavated earth as obtained to a distance up to 50mts. including all lift,levelling,ramming the foundation trenches, removing root of treese, shrubs all complete as per approved design, building specification and direction of e/i. earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 m. and lift of 1.5 m all complete as per building specification and direction of e/l (mode of measurement compacted volume). providing coarse cleansand filling in foundat-ion trenches or in plinth including ramming and waterind in layers not exceeding 150mm. thick with all leads including cost of materials, labour, royalty and taxes all complete as per building specification and direction of e/i providing designation 75 b brick
Sector: Zilla Parishad