Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work. ordinary soil 30% earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work. soft rockk 70% plain/reinfoced cement concrete in open foundation complete as per drwaing and technical specifications.pcc grade m15 plain/reinforced cement concrete in sub-strucutre complete as per drawing and technical specifications. pcc grade m20 plain/reinforced cement concre
Sector: Water Resource Department