Description: Construction of Bridge over near Aliyas Marar Dam between Machiyaghat to dipatoli in Kersai block district Simdega Name of Work Construction of Bridge over near Aliyas Marar Dam between Machiyaghat to dipatoli in Kersai block district Simdega
Details: CONSTRUCTION OF BRIDGEExcavation for structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)i) Ordinary Soil (Excavation upto 3.0m depth) ORDINARY Rock (blasting prohibited) Plain/Reinforced cement concrete (PCC Grade M10) in open foundation complete as per drawing and technical specifications. Plain/Reinforced cement concrete (RCC Grade M25) in open foundation complete as per drawing and technical specifications Filling Annular Space Around footing in Rock (in PCC M10). Supplying, fiiting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications. Plain/Reinforced cement concrete (RCC Grade M25) in substructure complete as per drawing and tec
Sector: RDPR