Details: earth work in excuvtion in foundation treanches in hard soil and disposal of excavated earth as obtained to adistance up to50m including all lift leveling , ramming trenches removing roots of tree shurbs all complete as per approval design, building specification & direction of e/i. extra for earth work in hard soil as per specification and direction of e/i providing earth filling in foundation trenches or in plinth including ramming and wateringin layers not exceeding 150mm thick with all leadsand lifts including cost of all materials labour, royaltyand taxes all complete as per building specification and direction of e/i providing course clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lift including cost of all materials,labour,royalty and taxes all complete as per specification and direction of e/i providing designation 75b one brick flat soling joints filled with local sand including
Sector: RDPR