Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ordinary soil, manual means, depth upto 3.0 m. sand filling in foundation trenches as per drawing & technical specification providing designation 75b one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of e/i. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level( 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20 mm nominal size) centring nd suttering including trutting, proping etc and removal of form work for foundation, footing base of columns,etc for mass concrete. construction of sub-grade and earthen
Sector: RDPR