Details: earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - a) and disposal of excavated earth a obtained to a distance up to 50m including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of e/i. extra for earth work in hard soil as per specification and direction of e/i. (vide classfication of soil item - b) earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge. earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5m all complete