Details: construction of bridgeexcavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) ii) ordinary soil (excavation 3m to 6m depth) hard rock (blasting prohibited) plain/reinforced cement concrete (pcc grade m15) in open foundation complete as per drawing and technical specifications. levelling course for pile capproviding and laying of pcc m15 (using batching plant & concrete pump) levelling course 100mm thick below the pile cap. cement concrete for reinforced concrete (rcc grade m30 using batching plant & cncrete pump) in pile cap complete as per drawing and technical specification plain/reinforced cement concrete (rcc grade m25) in open foundation complete as per drawing and technical specifications filling annular space around footing in rock (lean
Sector: RDPR