Details: (strengthening of road from sapter pwd mukhya path to pwd mukhya path via jalaiya (length-3.70 km.))scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. by mechanaical means using motor grader clearing grass and removal of up to a distance of 50 metres outside the periphery of the area by manual means construction of subgrade and earthen shoulders construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. wet mix macadam (plant mix method) providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform
Sector: RDPR