Details: earth work in excavation in foundation trenches in hard soil(vide classification of soil item-b) and disposal of excaveted earth as obtained to a distance upto 50m including all lifts levelling, ramming the foundation trenches, removing roots of trees,shrubs all complete as per approved design,building specification and direction of e/i. by mix in place method (construction of granular sub- base by providing manual close graded material spreding in uniform layers and compected with road roller complete as per clause 401). (ii) for grading -ii material for new road plain cement concrete in open foundation complete as per drawing and technical specification . (a) pcc grade m20(1:1.5:3), new road pcc filling in foundation trenches and plinth in layer not exceeding 150 mm thick well watered rammed fully compact -- do --do- complete job centering and shuttering including strutting , proping etc a
Sector: Labour and Employment