Details: clearing of grass and removal of upto a distance of 50 m outside the periphery of the area as per technical specification. loosening,leveling and compacting original ground supporting embankment to faciliate placement of first layer of embankment,scraified to depth of 150 mm mixed with water of omc and then compacted by rolling as to achieve minimum dry density as given in table 300.1 and 300.2 for embankment construction as per technical specification clause 301.41 granular sub-base with well graded material (table 400.1)by mix in place method (construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per technical specification clause 401.(iii) for grading i material providing and laying in position cement concrete of specified grade excluding the cost of centering an
Sector: RDPR