Details: clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification. construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface. mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. construction of un-reinforced, dowel jointed at expansion and construction joint only plain cement concrete pavement, thickness as per design drawing and technical specification clause 1501 providing and erecting direction and place identification retro-reflectorised sign as per approved drawing goods & service tax (g.s.t.) - labour cess -
Sector: Zilla Parishad